{"id":2225,"date":"2021-05-30T22:44:57","date_gmt":"2021-05-30T20:44:57","guid":{"rendered":"https:\/\/www.klicarquitectos.com\/contest-teatinos-high-school\/"},"modified":"2026-10-04T09:03:20","modified_gmt":"2026-10-04T07:03:20","slug":"contest-teatinos-high-school","status":"publish","type":"post","link":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/","title":{"rendered":"Competition \u00b7 Secondary school in Teatinos, M\u00e1laga \u00b7 \u201cSage Green\u201d"},"content":{"rendered":"<p>A courtyard in the middle, two modules, each with its own front door, and on the fa\u00e7ade the sage green that gives the entry its name. \u201cSage Green\u201d is what we entered in the public competition for a secondary school in Teatinos, M\u00e1laga. The challenge was the land itself: the full ESO and Bachillerato programme (lower and upper secondary), plus a sports court and playgrounds, had to fit on a plot zoned for public facilities, hemmed in by major roads and recently built housing blocks. The answer was to make the building compact and free up the ground.<\/p>\n<h2>The brief: a secondary school in Teatinos<\/h2>\n<p>Teatinos is one of the fastest-growing districts in the city of M\u00e1laga. It is home to the University of M\u00e1laga campus and the Virgen de la Victoria University Hospital, surrounded by new-build blocks of flats. The area\u2019s network of state schools had fallen short, and that is where the competition came from: there were not enough secondary-school places for a young population already living in the neighbourhood.<\/p>\n<p>In a competition for a state school the programme is not up for negotiation; it is handed to you. Classrooms for ESO (lower secondary, ages 12 to 16) and Bachillerato (the two pre-university years), a library, a multipurpose hall, a dining room, administration, a sports court and playgrounds. The plot, set among other public facilities, major roads and recent residential blocks, left no room to spread out.<\/p>\n<h2>The proposal: a central courtyard and two separate stages<\/h2>\n<p>The first decision was to build compactly: clear volumes with a small footprint, so that the ground saved goes to courtyards, playgrounds and the sports pitch rather than to corridors. On a tight plot zoned for public facilities, open space is the scarce material; the building is the part you can compress.<\/p>\n<p>From there, everything is organised around a central courtyard. It is not a gesture: it is the mechanism that distributes the flow of pupils and the reason every classroom gets natural light and ventilation. The two stages, ESO and Bachillerato, occupy separate modules with their own entrances: two age groups with different timetables have no reason to share a front door.<\/p>\n<p>Separation uses up entrances and perimeter, and that has to be accepted. It is offset by concentrating the shared rooms \u2014 library, multipurpose hall, dining room and administration \u2014 in the common spaces that link the two modules.<\/p>\n<h2>Envelope, climate and accessibility<\/h2>\n<p>The envelope alternates solid panels with glazing protected by solar-control systems, according to orientation. In M\u00e1laga, orientation and shade do more for comfort in a classroom than any air-conditioning plant, and that work either happens in the design or it does not happen at all. Cross-ventilation and solar shading are sized to cut the building\u2019s energy demand, not to look good in the render.<\/p>\n<p>The multi-sports court and the playgrounds are sized to the regulations the Junta de Andaluc\u00eda \u2014 Andalusia\u2019s regional government \u2014 sets for secondary schools, and those rules settle most of these debates before they start. Accessibility is resolved in the same move: accessible routes, stairs and lifts sized for intensive use (a secondary school empties its classrooms all at once, not one by one), and signage built into the design rather than stuck on afterwards.<\/p>\n<p>The sage green that gives the entry its name appears on the envelope and in the key spaces. It is not a last-minute decoration; it is how the school is recognised from the street.<\/p>\n<h2>Where it ended up<\/h2>\n<p>\u201cSage Green\u201d remained a proposal. It is an entry to a public competition, not a completed building, and that is worth saying plainly. What survives a competition is the judgement \u2014 how to read a tight plot zoned for public facilities, how to separate stages without duplicating the building \u2014 and that judgement gets reused. It is the part of the work nobody sees, and the part that ends up being put to use in the next project.<\/p>\n<h2>Gallery<\/h2>\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg\" alt=\"Render of the secondary school in Teatinos, M\u00e1laga \u00b7 \u201cSage Green\u201d competition entry by Klic Arquitectos with courtyard and sports pitch\" class=\"wp-image-19401\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg 1536w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia-300x200.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia-1024x683.jpg 1024w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><figcaption>Render of the \u201cSage Green\u201d proposal \u00b7 secondary school competition in Teatinos, M\u00e1laga \u00b7 Klic Arquitectos<\/figcaption><\/figure>\n<h2>Project data<\/h2>\n<ul>\n<li><strong>Typology:<\/strong> Architecture competition \u2014 public educational facility<\/li>\n<li><strong>Use:<\/strong> Education \u2014 secondary school (ESO and Bachillerato)<\/li>\n<li><strong>Location:<\/strong> Teatinos, M\u00e1laga<\/li>\n<li><strong>Status:<\/strong> Competition proposal. Not built<\/li>\n<li><strong>Klic services:<\/strong> Proposal for a public architecture competition<\/li>\n<\/ul>\n<h2>Other Klic Arquitectos projects in Teatinos and M\u00e1laga<\/h2>\n<p>The studio has also worked on other projects in Teatinos, such as <a href=\"https:\/\/www.klicarquitectos.com\/en\/promalaga-teatinos\/\">Prom\u00e1laga Teatinos<\/a>, a multi-family housing scheme in the same district. Elsewhere in the city of M\u00e1laga, Klic Arquitectos works on residential, public-facility and heritage projects such as <a href=\"https:\/\/www.klicarquitectos.com\/en\/blog\/reforma-integral-de-edificio-plurifamiliar\/\">MOSS<\/a> in the centre, <a href=\"https:\/\/www.klicarquitectos.com\/en\/blog\/duquesa-parcent\/\">Casa Duquesa de Parcent<\/a> and the <a href=\"https:\/\/www.klicarquitectos.com\/en\/blog\/la-equitativa\/\">La Equitativa<\/a> proposal facing Calle Larios.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"inLanguage\":\"en-GB\",\"headline\":\"Competition \u00b7 Secondary school in Teatinos, M\u00e1laga \u00b7 \u201cSage Green\u201d \u00b7 Klic Arquitectos\",\"image\":\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg\",\"author\":{\"@type\":\"Organization\",\"name\":\"Klic Arquitectos\"},\"publisher\":{\"@type\":\"Organization\",\"name\":\"Klic Arquitectos\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/klic_arquitectos.svg\"}},\"mainEntityOfPage\":\"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/\",\"about\":{\"@type\":\"Place\",\"name\":\"Teatinos\",\"address\":{\"@type\":\"PostalAddress\",\"addressLocality\":\"M\u00e1laga\",\"addressRegion\":\"Andalusia\",\"addressCountry\":\"ES\"}}},{\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Where is the secondary school designed by Klic Arquitectos located?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The competition site is in the Teatinos district of M\u00e1laga city, an area of strong residential growth that is home to the University of M\u00e1laga (UMA) campus and to healthcare facilities.\"}},{\"@type\":\"Question\",\"name\":\"What educational programme does the project house?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The school is sized for Compulsory Secondary Education (ESO) and Bachillerato (upper secondary), with administrative areas, a dining room, a library, a multipurpose hall, a sports court and courtyards.\"}},{\"@type\":\"Question\",\"name\":\"What stage is the project at?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"\u201cSage Green\u201d is the proposal Klic Arquitectos submitted to the public architecture competition for a new secondary school in Teatinos.\"}},{\"@type\":\"Question\",\"name\":\"Who is behind the architectural proposal?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The Klic Arquitectos team of Ahmad Ghoreishi, Ruth Buj\u00e1n Varela and Juan A. Go\u00f1i Uriarte, in collaboration with Beatriz S\u00e1nchez Sep\u00falveda, Bel\u00e9n Rojano, Sandra Tuslidas and Azahara Gil.\"}}]}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Klic Arquitectos\u2019 \u201cSage Green\u201d entry to the competition for a secondary school in Teatinos, M\u00e1laga: central courtyard, separate stages and a sports court.<\/p>\n","protected":false},"author":1,"featured_media":19402,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[39],"tags":[],"class_list":["post-2225","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-others"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Secondary school in Teatinos \u00b7 \u201cSage Green\u201d competition<\/title>\n<meta name=\"description\" content=\"\u201cSage Green\u201d, our competition entry for a secondary school in Teatinos, M\u00e1laga: a compact central-courtyard scheme, separate stages and solar control.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Secondary school in Teatinos \u00b7 \u201cSage Green\u201d competition\" \/>\n<meta property=\"og:description\" content=\"\u201cSage Green\u201d, our competition entry for a secondary school in Teatinos, M\u00e1laga: a compact central-courtyard scheme, separate stages and solar control.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/\" \/>\n<meta property=\"og:site_name\" content=\"Klic Arquitectos\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/klicarquitectos\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-30T20:44:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-04T07:03:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2021\/05\/ChatGPT-Image-5-mar-2026-13_12_15-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin_solbyte\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2021\/05\/ChatGPT-Image-5-mar-2026-13_12_15.png\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_solbyte\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/\"},\"author\":{\"name\":\"admin_solbyte\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/person\\\/b088e98ec16e7b8567544de9564df77a\"},\"headline\":\"Competition \u00b7 Secondary school in Teatinos, M\u00e1laga \u00b7 \u201cSage Green\u201d\",\"datePublished\":\"2021-05-30T20:44:57+00:00\",\"dateModified\":\"2026-10-04T07:03:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/\"},\"wordCount\":782,\"publisher\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg\",\"articleSection\":[\"Others\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/\",\"name\":\"Secondary school in Teatinos \u00b7 \u201cSage Green\u201d competition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg\",\"datePublished\":\"2021-05-30T20:44:57+00:00\",\"dateModified\":\"2026-10-04T07:03:20+00:00\",\"description\":\"\u201cSage Green\u201d, our competition entry for a secondary school in Teatinos, M\u00e1laga: a compact central-courtyard scheme, separate stages and solar control.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg\",\"contentUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"Render \u00b7 Secondary school in Teatinos, M\u00e1laga \u00b7 Sage Green proposal by Klic Arquitectos with courtyard and sports pitch\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/contest-teatinos-high-school\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Competition \u00b7 Secondary school in Teatinos, M\u00e1laga \u00b7 \u201cSage Green\u201d\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/\",\"name\":\"Klic Arquitectos\",\"description\":\"Architecture studio in M\u00e1laga. Design, new builds and renovations\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#organization\",\"name\":\"Klic Arquitectos\",\"alternateName\":\"KlicStudio\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/logo.jpg\",\"contentUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/logo.jpg\",\"width\":520,\"height\":485,\"caption\":\"Klic Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/klicarquitectos\",\"https:\\\/\\\/www.instagram.com\\\/klicarquitectos\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/klic-arquitectos\\\/\",\"https:\\\/\\\/es.pinterest.com\\\/klicarquitectos\\\/\",\"https:\\\/\\\/www.houzz.es\\\/profesionales\\\/arquitectos\\\/klic-arquitectos-pfvwes-pf~849779902\",\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q140980296\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/person\\\/b088e98ec16e7b8567544de9564df77a\",\"name\":\"admin_solbyte\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g\",\"caption\":\"admin_solbyte\"},\"sameAs\":[\"https:\\\/\\\/www.klicarquitectos.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Secondary school in Teatinos \u00b7 \u201cSage Green\u201d competition","description":"\u201cSage Green\u201d, our competition entry for a secondary school in Teatinos, M\u00e1laga: a compact central-courtyard scheme, separate stages and solar control.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/","og_locale":"en_US","og_type":"article","og_title":"Secondary school in Teatinos \u00b7 \u201cSage Green\u201d competition","og_description":"\u201cSage Green\u201d, our competition entry for a secondary school in Teatinos, M\u00e1laga: a compact central-courtyard scheme, separate stages and solar control.","og_url":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/","og_site_name":"Klic Arquitectos","article_publisher":"https:\/\/www.facebook.com\/klicarquitectos","article_published_time":"2021-05-30T20:44:57+00:00","article_modified_time":"2026-10-04T07:03:20+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2021\/05\/ChatGPT-Image-5-mar-2026-13_12_15-1024x683.png","type":"image\/png"}],"author":"admin_solbyte","twitter_card":"summary_large_image","twitter_image":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2021\/05\/ChatGPT-Image-5-mar-2026-13_12_15.png","twitter_misc":{"Written by":"admin_solbyte","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/#article","isPartOf":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/"},"author":{"name":"admin_solbyte","@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/person\/b088e98ec16e7b8567544de9564df77a"},"headline":"Competition \u00b7 Secondary school in Teatinos, M\u00e1laga \u00b7 \u201cSage Green\u201d","datePublished":"2021-05-30T20:44:57+00:00","dateModified":"2026-10-04T07:03:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/"},"wordCount":782,"publisher":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#organization"},"image":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/#primaryimage"},"thumbnailUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg","articleSection":["Others"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/","url":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/","name":"Secondary school in Teatinos \u00b7 \u201cSage Green\u201d competition","isPartOf":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/#primaryimage"},"image":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/#primaryimage"},"thumbnailUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg","datePublished":"2021-05-30T20:44:57+00:00","dateModified":"2026-10-04T07:03:20+00:00","description":"\u201cSage Green\u201d, our competition entry for a secondary school in Teatinos, M\u00e1laga: a compact central-courtyard scheme, separate stages and solar control.","breadcrumb":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/#primaryimage","url":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg","contentUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/instituto-educacion-secundaria-teatinos-malaga-equipamiento-infografia.jpg","width":1536,"height":1024,"caption":"Render \u00b7 Secondary school in Teatinos, M\u00e1laga \u00b7 Sage Green proposal by Klic Arquitectos with courtyard and sports pitch"},{"@type":"BreadcrumbList","@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/contest-teatinos-high-school\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.klicarquitectos.com\/en\/"},{"@type":"ListItem","position":2,"name":"Competition \u00b7 Secondary school in Teatinos, M\u00e1laga \u00b7 \u201cSage Green\u201d"}]},{"@type":"WebSite","@id":"https:\/\/www.klicarquitectos.com\/en\/#website","url":"https:\/\/www.klicarquitectos.com\/en\/","name":"Klic Arquitectos","description":"Architecture studio in M\u00e1laga. Design, new builds and renovations","publisher":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.klicarquitectos.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.klicarquitectos.com\/en\/#organization","name":"Klic Arquitectos","alternateName":"KlicStudio","url":"https:\/\/www.klicarquitectos.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/logo.jpg","contentUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/logo.jpg","width":520,"height":485,"caption":"Klic Arquitectos"},"image":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/klicarquitectos","https:\/\/www.instagram.com\/klicarquitectos\/","https:\/\/www.linkedin.com\/company\/klic-arquitectos\/","https:\/\/es.pinterest.com\/klicarquitectos\/","https:\/\/www.houzz.es\/profesionales\/arquitectos\/klic-arquitectos-pfvwes-pf~849779902","https:\/\/www.wikidata.org\/wiki\/Q140980296"]},{"@type":"Person","@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/person\/b088e98ec16e7b8567544de9564df77a","name":"admin_solbyte","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g","caption":"admin_solbyte"},"sameAs":["https:\/\/www.klicarquitectos.com"]}]}},"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/2225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/comments?post=2225"}],"version-history":[{"count":17,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/2225\/revisions"}],"predecessor-version":[{"id":31291,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/2225\/revisions\/31291"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/media\/19402"}],"wp:attachment":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=2225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/categories?post=2225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/tags?post=2225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}