{"id":2213,"date":"2021-05-31T09:33:20","date_gmt":"2021-05-31T07:33:20","guid":{"rendered":"https:\/\/www.klicarquitectos.com\/smy-costal-del-sol\/"},"modified":"2026-09-06T11:25:59","modified_gmt":"2026-09-06T09:25:59","slug":"smy-costal-del-sol","status":"publish","type":"post","link":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/","title":{"rendered":"Smy Costa del Sol Hotel \u00b7 Full refurbishment in Torremolinos"},"content":{"rendered":"<p>Twenty-two buildings on the seafront, 312 hotel rooms, 200 apartments and one design idea: turn the whole resort to face the water. This hotel refurbishment in Torremolinos \u2014 35,161 m\u00b2 of it \u2014 took a 1973 holiday complex and brought it out of the works as a four-star hotel. The brief reached us through the engineering firm managing the asset: concept design, technical design and site supervision. The main contract ran for five and a half months.<\/p>\n<h2>The brief: a 1973 resort living two lives<\/h2>\n<p>The resort had two regimes under one name: 312 hotel rooms and 200 apartments. The owner, a property company within an institutional hotel platform, appointed a large Spanish engineering firm as project manager, and they in turn appointed us for the concept design (<em>proyecto b\u00e1sico<\/em>), the technical design (<em>proyecto de ejecuci\u00f3n<\/em>), the health and safety study, the waste management study and site supervision. The professional register puts it plainly: refurbishment of a hotel and upgrade of its classification. Torremolinos is the market we work in day to day, and we have written separately about <a href=\"https:\/\/www.klicarquitectos.com\/en\/blog\/hospitality-architecture-torremolinos\/\">hospitality architecture in Torremolinos<\/a>.<\/p>\n<p>The scope is blocks 1 to 19: 35,161 m\u00b2 of the 50,306 m\u00b2 resort. Blocks 20 to 22, with 168 rooms, stay outside it. The works were consented under planning permission (<em>licencia de obras<\/em>) no. 22\/18 from Torremolinos town hall, with the splash park handled as a separate application.<\/p>\n<h2>From apartment to hotel room<\/h2>\n<p>A star rating is not won with soft furnishings. It is won by changing the room type. The 200 apartments in blocks 1 to 18 stopped being apartments and became hotel rooms, which drags services, fire safety and accessibility along behind it. The refurbished scope settled at 340 rooms: 34 singles, 113 doubles, 84 triples and 109 quadruples. That mix is a decision, not an accident. It is a hotel sized for families rather than couples.<\/p>\n<p>Finishes were chosen for heavy use, which is what really tests a hotel. Vinyl flooring over a levelling screed in bedrooms and bathrooms. Oak entrance doors with 30-minute fire resistance. HPL panelling in the corridors around every doorway, precisely where housekeeping trolleys land. Ceramic rug panels in the junior suites. And before the main works began we built the mock-up rooms, signed off on 3 August 2018, four months ahead of the main contract. Arguing about a room you can walk into is a good deal cheaper than arguing about it with the floor already down.<\/p>\n<h2>Moving the water to the centre<\/h2>\n<p>The pool sat off to one side, with an awkward perimeter, and the caf\u00e9-bar sat away from the action too. The design decision was to bring both into the middle of the site. A new overflow pool, with 504 m\u00b2 of water and 1,740 m\u00b2 of deck around it. The caf\u00e9-bar moves from the edge to the centre, beside the water: deck and bar have worked together as the resort\u2019s social heart ever since. Around them, a pool bar with its own plant room, new pergolas on the events terrace and the splash park, consented separately. Anyone who knows our <a href=\"https:\/\/www.klicarquitectos.com\/en\/blog\/beach-club-puente-real\/\">Beach Club at Hotel Puente Real<\/a>, also in Torremolinos, will recognise the same instinct: on this coast the pool deck, not the lobby, is where guests spend the day.<\/p>\n<p>The decision that carries most weight, though, is a decision in section. We raised the pool terrace to meet the level of the events terrace. The two surfaces now read as one continuous plane, and the sea horizon comes through cleanly from well back on the site. The bedroom fa\u00e7ades of the main block already stepped in a sawtooth line, balconies angled towards the water; the new deck level completes that geometry at ground level rather than fighting it. Vehicle and pedestrian access to the resort was rebuilt in the same works.<\/p>\n<h2>Five and a half months on site<\/h2>\n<p>The programme set the terms. The main contract was signed on 4 December 2018 and the completion certificate issued on 16 May 2019, with the splash park a day behind. To hit that date the works were split into three tender packages: bedrooms; ground floor and public areas; the whole. At one point four different contractors were on site at once \u2014 main works, finishes, pool and splash park. Ruth Buj\u00e1n and Juan A. Go\u00f1i signed as architects for the works, with Vicente Bejarano as quantity surveyor supervising construction (<em>director de la ejecuci\u00f3n<\/em>).<\/p>\n<p>One chapter of the works explains the project better than any visual: the repairs arising from the ITE. The ITE (<em>inspecci\u00f3n t\u00e9cnica de edificios<\/em>) is Spain\u2019s mandatory periodic inspection of older buildings. What it called for on a 1973 building was not parked in a later application or pushed to the following season. It went into the same contract, with the same builder, on the same programme. Cheaper and cleaner, but it means looking hard at the frame before choosing a single finish. Under the linings there were column and slab strengthening works in the main block, a steel-framed structure with spans of around 6 m.<\/p>\n<p>The resort came out of the works with 340 hotel rooms where there had been a mixture of hotel and apartments, a four-star classification, and the pool frontage working as the centre of the site. Completion certificates for the hotel, the pool and the splash park were all signed in May 2019. The file stayed open afterwards, with the restaurant and further built works regularised in turn: on a hotel asset, a refurbishment rarely ends on handover day. The same discipline runs through the rest of our hospitality work, from the <a href=\"https:\/\/www.klicarquitectos.com\/en\/blog\/kids-club-at-hotel-puente-romano\/\">Kids Club at Hotel Puente Romano<\/a> in Marbella to <a href=\"https:\/\/www.klicarquitectos.com\/en\/hotel-origen\/\">Hotel Origen<\/a> in Alcaidesa, C\u00e1diz.<\/p>\n<h2>Gallery<\/h2>\n<figure class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<ul class=\"blocks-gallery-grid\">\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-14696\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_21_13_24.Still089-scaled-1-scaled.jpg\" alt=\"Aerial view of Smy Costa del Sol Hotel ensemble in Torremolinos (M\u00e1laga), seafront hotel architecture by Klic Arquitectos\" data-id=\"14696\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_21_13_24.Still089-scaled-1-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_21_13_24.Still089-scaled-1-300x169.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_21_13_24.Still089-scaled-1-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1081\" class=\"wp-image-14982\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3384-scaled.jpg\" alt=\"Main fa\u00e7ade of Smy Costa del Sol Hotel in Torremolinos (M\u00e1laga), full refurbishment by Klic Arquitectos\" data-id=\"14982\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3384-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3384-300x169.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3384-1024x577.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1081\" class=\"wp-image-14983\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3497-scaled.jpg\" alt=\"Pool and sun deck area at Smy Costa del Sol Hotel in Torremolinos (M\u00e1laga), hospitality design by Klic Arquitectos\" data-id=\"14983\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3497-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3497-300x169.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3497-1024x577.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1081\" class=\"wp-image-14984\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3509-scaled.jpg\" alt=\"Terrace overlooking the Mediterranean at Smy Costa del Sol Hotel in Torremolinos (M\u00e1laga), hotel architecture by Klic Arquitectos\" data-id=\"14984\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3509-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3509-300x169.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3509-1024x577.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-14985\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_00_56_33.Still003-scaled.jpg\" alt=\"Main entrance of Smy Costa del Sol Hotel in Torremolinos (M\u00e1laga), hospitality refurbishment by Klic Arquitectos\" data-id=\"14985\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_00_56_33.Still003-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_00_56_33.Still003-300x169.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_00_56_33.Still003-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"989\" class=\"wp-image-14986\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_03_28_36.Still011-scaled.jpg\" alt=\"Lobby and reception of Smy Costa del Sol Hotel in Torremolinos (M\u00e1laga), hotel interior design by Klic Arquitectos\" data-id=\"14986\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_03_28_36.Still011-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_03_28_36.Still011-300x155.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_03_28_36.Still011-1024x528.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-13091\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_04_41_12.Still015-1-scaled.jpg\" alt=\"Indoor lounge area at Smy Costa del Sol Hotel in Torremolinos (M\u00e1laga), hotel interior by Klic Arquitectos\" data-id=\"13091\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_04_41_12.Still015-1-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_04_41_12.Still015-1-300x169.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_04_41_12.Still015-1-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-14987\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_28_56_05.Still107-scaled.jpg\" alt=\"Standard guest room at Smy Costa del Sol Hotel in Torremolinos (M\u00e1laga), hotel architecture and interior by Klic Arquitectos\" data-id=\"14987\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_28_56_05.Still107-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_28_56_05.Still107-300x169.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_28_56_05.Still107-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-14988\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_29_17_08.Still109-scaled.jpg\" alt=\"Restaurant and buffet area at Smy Costa del Sol Hotel in Torremolinos (M\u00e1laga), hotel interior by Klic Arquitectos\" data-id=\"14988\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_29_17_08.Still109-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_29_17_08.Still109-300x169.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_29_17_08.Still109-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<li class=\"blocks-gallery-item\">\n<figure><img loading=\"lazy\" decoding=\"async\" width=\"1920\" height=\"1080\" class=\"wp-image-14989\" src=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_31_55_49.Still112-scaled.jpg\" alt=\"Terrace bar and social area at Smy Costa del Sol Hotel in Torremolinos (M\u00e1laga), hotel architecture by Klic Arquitectos\" data-id=\"14989\" srcset=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_31_55_49.Still112-scaled.jpg 1920w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_31_55_49.Still112-300x169.jpg 300w, https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_31_55_49.Still112-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/figure>\n<\/li>\n<\/ul>\n<\/figure>\n<h2>Project data<\/h2>\n<ul>\n<li><strong>Typology:<\/strong> Hospitality \u00b7 full refurbishment of a seafront resort<\/li>\n<li><strong>Use:<\/strong> Hotel. Consented as refurbishment of a hotel and upgrade to four-star classification<\/li>\n<li><strong>Location:<\/strong> Torremolinos, Costa del Sol (M\u00e1laga)<\/li>\n<li><strong>Design year:<\/strong> 2018 (concept design in April; technical design in July)<\/li>\n<li><strong>Construction year:<\/strong> 2018-2019<\/li>\n<li><strong>Status:<\/strong> Built. Completion certificate issued May 2019<\/li>\n<li><strong>Built area:<\/strong> 35,161 m\u00b2 within the scope of works (blocks 1 to 19), in a resort of 50,306 m\u00b2 across 22 buildings<\/li>\n<li><strong>Units:<\/strong> 340 rooms after the refurbishment (34 singles, 113 doubles, 84 triples, 109 quadruples), from 344 before<\/li>\n<li><strong>Client:<\/strong> Property company owning the hotel asset, through a large Spanish engineering firm acting as project manager<\/li>\n<li><strong>Planning permission:<\/strong> Licence no. 22\/18, Torremolinos town hall; splash park consented separately<\/li>\n<li><strong>Contractors:<\/strong> Verosa S.L. on the main works, with Ferrovial named on the completion certificate; Proffetional Finishing Design S.L.; Vortex on the splash park<\/li>\n<li><strong>Architects and site supervision:<\/strong> Juan A. Go\u00f1i Uriarte and Ruth Buj\u00e1n Varela (Klic Arquitectos)<\/li>\n<li><strong>Construction supervision (quantity surveyor):<\/strong> Vicente Bejarano Reyes, technical architect<\/li>\n<li><strong>MEP engineering:<\/strong> Monier (HVAC and electrical)<\/li>\n<li><strong>Structural engineering:<\/strong> Juan Morilla (column and slab strengthening, main block) and Monier (pool and plant room)<\/li>\n<li><strong>Health and safety:<\/strong> Study and site coordination: Jos\u00e9 G\u00f3mez Villarrubia<\/li>\n<li><strong>Klic services:<\/strong> Concept design, technical design, health and safety study, waste management study, site supervision and interior design of rooms and public areas<\/li>\n<li><strong>Team:<\/strong> Juan A. Go\u00f1i Uriarte and Ruth Buj\u00e1n Varela<\/li>\n<\/ul>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"Article\",\"inLanguage\":\"en\",\"headline\":\"Smy Costa del Sol Hotel \u00b7 Full refurbishment in Torremolinos\",\"image\":[\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/PANA3608.00_21_13_24.Still089-scaled-1-scaled.jpg\"],\"author\":{\"@type\":\"Organization\",\"name\":\"Klic Arquitectos\",\"url\":\"https:\/\/www.klicarquitectos.com\"},\"publisher\":{\"@type\":\"Organization\",\"name\":\"Klic Arquitectos\"},\"mainEntityOfPage\":\"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/\",\"about\":{\"@type\":\"Place\",\"name\":\"Torremolinos\",\"address\":{\"@type\":\"PostalAddress\",\"addressLocality\":\"Torremolinos\",\"addressRegion\":\"Andalusia\",\"addressCountry\":\"ES\"}}}<\/script><\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What does the Smy Costa del Sol refurbishment involve?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A full refurbishment in Torremolinos updating image, rooms and public areas under a unified architectural vision by Klic Arquitectos.\"}},{\"@type\":\"Question\",\"name\":\"Where is it located?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"In Torremolinos, on the seafront of the Costa del Sol, province of M\u00e1laga.\"}},{\"@type\":\"Question\",\"name\":\"Challenges of a hotel project in Torremolinos?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Intensive use, marine environment, tourism-sector regulations and brand identity in a competitive market.\"}},{\"@type\":\"Question\",\"name\":\"Other hospitality projects on the Costa del Sol?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes, in Torremolinos, Marbella, Benalm\u00e1dena and across M\u00e1laga and C\u00e1diz.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Full refurbishment and four-star upgrade of a 35,161 m\u00b2 beach resort in Torremolinos, on the Costa del Sol seafront (M\u00e1laga). Design and site supervision by Klic Arquitectos.<\/p>\n","protected":false},"author":1,"featured_media":19367,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[43,37],"tags":[],"class_list":["post-2213","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hotel-projects","category-marbella-projects"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Smy Costa del Sol: hotel refurbishment in Torremolinos<\/title>\n<meta name=\"description\" content=\"Hotel refurbishment in Torremolinos: 35,161 m\u00b2, 340 rooms and a four-star upgrade delivered in five and a half months on site.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Smy Costa del Sol: hotel refurbishment in Torremolinos\" \/>\n<meta property=\"og:description\" content=\"Hotel refurbishment in Torremolinos: 35,161 m\u00b2, 340 rooms and a four-star upgrade delivered in five and a half months on site.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/\" \/>\n<meta property=\"og:site_name\" content=\"Klic Arquitectos\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/klicarquitectos\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-31T07:33:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-06T09:25:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin_solbyte\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_solbyte\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/\"},\"author\":{\"name\":\"admin_solbyte\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/person\\\/b088e98ec16e7b8567544de9564df77a\"},\"headline\":\"Smy Costa del Sol Hotel \u00b7 Full refurbishment in Torremolinos\",\"datePublished\":\"2021-05-31T07:33:20+00:00\",\"dateModified\":\"2026-09-06T09:25:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/\"},\"wordCount\":1154,\"publisher\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg\",\"articleSection\":[\"Hotel projects\",\"Marbella projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/\",\"name\":\"Smy Costa del Sol: hotel refurbishment in Torremolinos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg\",\"datePublished\":\"2021-05-31T07:33:20+00:00\",\"dateModified\":\"2026-09-06T09:25:59+00:00\",\"description\":\"Hotel refurbishment in Torremolinos: 35,161 m\u00b2, 340 rooms and a four-star upgrade delivered in five and a half months on site.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"Infograf\u00eda \u00b7 Vista a\u00e9rea del Hotel Smy Costa del Sol en Torremolinos (M\u00e1laga), arquitectura hotelera en primera l\u00ednea de mar por Klic Arquitectos\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/blog\\\/smy-costa-del-sol\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Smy Costa del Sol Hotel \u00b7 Full refurbishment in Torremolinos\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/\",\"name\":\"Klic Arquitectos\",\"description\":\"Estudio de arquitectura en M\u00e1laga. Dise\u00f1o, obra nueva y reformas\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#organization\",\"name\":\"Klic Arquitectos\",\"alternateName\":\"KlicStudio\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/logo.jpg\",\"contentUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/logo.jpg\",\"width\":520,\"height\":485,\"caption\":\"Klic Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/klicarquitectos\",\"https:\\\/\\\/www.instagram.com\\\/klicarquitectos\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/klicstudio\\\/\",\"https:\\\/\\\/www.pinterest.es\\\/klicarquitectos\\\/\",\"https:\\\/\\\/www.houzz.es\\\/pro\\\/klicarquitectos\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/person\\\/b088e98ec16e7b8567544de9564df77a\",\"name\":\"admin_solbyte\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g\",\"caption\":\"admin_solbyte\"},\"sameAs\":[\"https:\\\/\\\/www.klicarquitectos.com\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Smy Costa del Sol: hotel refurbishment in Torremolinos","description":"Hotel refurbishment in Torremolinos: 35,161 m\u00b2, 340 rooms and a four-star upgrade delivered in five and a half months on site.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/","og_locale":"en_US","og_type":"article","og_title":"Smy Costa del Sol: hotel refurbishment in Torremolinos","og_description":"Hotel refurbishment in Torremolinos: 35,161 m\u00b2, 340 rooms and a four-star upgrade delivered in five and a half months on site.","og_url":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/","og_site_name":"Klic Arquitectos","article_publisher":"https:\/\/www.facebook.com\/klicarquitectos","article_published_time":"2021-05-31T07:33:20+00:00","article_modified_time":"2026-09-06T09:25:59+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg","type":"image\/jpeg"}],"author":"admin_solbyte","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_solbyte","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/#article","isPartOf":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/"},"author":{"name":"admin_solbyte","@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/person\/b088e98ec16e7b8567544de9564df77a"},"headline":"Smy Costa del Sol Hotel \u00b7 Full refurbishment in Torremolinos","datePublished":"2021-05-31T07:33:20+00:00","dateModified":"2026-09-06T09:25:59+00:00","mainEntityOfPage":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/"},"wordCount":1154,"publisher":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#organization"},"image":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/#primaryimage"},"thumbnailUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg","articleSection":["Hotel projects","Marbella projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/","url":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/","name":"Smy Costa del Sol: hotel refurbishment in Torremolinos","isPartOf":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/#primaryimage"},"image":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/#primaryimage"},"thumbnailUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg","datePublished":"2021-05-31T07:33:20+00:00","dateModified":"2026-09-06T09:25:59+00:00","description":"Hotel refurbishment in Torremolinos: 35,161 m\u00b2, 340 rooms and a four-star upgrade delivered in five and a half months on site.","breadcrumb":{"@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/#primaryimage","url":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg","contentUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2026\/09\/hotel-smy-costa-del-sol-reforma-hotel-torremolinos-infografia-1.jpg","width":1536,"height":1024,"caption":"Infograf\u00eda \u00b7 Vista a\u00e9rea del Hotel Smy Costa del Sol en Torremolinos (M\u00e1laga), arquitectura hotelera en primera l\u00ednea de mar por Klic Arquitectos"},{"@type":"BreadcrumbList","@id":"https:\/\/www.klicarquitectos.com\/en\/blog\/smy-costa-del-sol\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.klicarquitectos.com\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Smy Costa del Sol Hotel \u00b7 Full refurbishment in Torremolinos"}]},{"@type":"WebSite","@id":"https:\/\/www.klicarquitectos.com\/en\/#website","url":"https:\/\/www.klicarquitectos.com\/en\/","name":"Klic Arquitectos","description":"Estudio de arquitectura en M\u00e1laga. Dise\u00f1o, obra nueva y reformas","publisher":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.klicarquitectos.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.klicarquitectos.com\/en\/#organization","name":"Klic Arquitectos","alternateName":"KlicStudio","url":"https:\/\/www.klicarquitectos.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/logo.jpg","contentUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/logo.jpg","width":520,"height":485,"caption":"Klic Arquitectos"},"image":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/klicarquitectos","https:\/\/www.instagram.com\/klicarquitectos\/","https:\/\/www.linkedin.com\/company\/klicstudio\/","https:\/\/www.pinterest.es\/klicarquitectos\/","https:\/\/www.houzz.es\/pro\/klicarquitectos"]},{"@type":"Person","@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/person\/b088e98ec16e7b8567544de9564df77a","name":"admin_solbyte","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/edd888738bb98bddffbea2c50034264e135aaa1849baae74099aa811d4485252?s=96&d=mm&r=g","caption":"admin_solbyte"},"sameAs":["https:\/\/www.klicarquitectos.com"]}]}},"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/2213","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/comments?post=2213"}],"version-history":[{"count":5,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/2213\/revisions"}],"predecessor-version":[{"id":20841,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/2213\/revisions\/20841"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/media\/19367"}],"wp:attachment":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=2213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/categories?post=2213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/tags?post=2213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}