{"id":20011,"date":"2026-08-12T12:01:32","date_gmt":"2026-08-12T10:01:32","guid":{"rendered":"https:\/\/www.klicarquitectos.com\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/"},"modified":"2026-09-05T02:30:27","modified_gmt":"2026-09-05T00:30:27","slug":"hotel-use-permits-costa-del-sol-timescales-by-town-hall","status":"publish","type":"post","link":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/","title":{"rendered":"Hotel use permits on the Costa del Sol: timescales by town hall"},"content":{"rendered":"<p>One of the factors that most shapes the timetable of a hotel project on the Costa del Sol is not the construction but the <strong>permit<\/strong>. Securing hotel use and the building permit on time makes the difference between opening in the planned season or missing it. We explain what the timescales depend on and how they are managed.<\/p>\n<h2>Which permits are involved in a hotel<\/h2>\n<p>A hotel does not need a single authorisation. It usually involves <strong>planning compatibility<\/strong> and hotel use under the planning framework (the PGOU or by-law), the <strong>building permit<\/strong> (new build or refurbishment), the <strong>tourism classification<\/strong> from the Junta de Andaluc\u00eda and, at the end, the <strong>opening and occupancy licence<\/strong>. Each has its own circuit and its own timescale.<\/p>\n<h2>What the timescales depend on<\/h2>\n<p>The timescale depends above all on the <strong>town hall<\/strong>, the type of intervention (new build versus refurbishment), how complete the project is and whether hotel use is admitted from the outset on that plot. A well-prepared file, complete and compliant with the regulations from day one, is what shortens the process most: the majority of delays come from requests for incomplete documentation.<\/p>\n<h2>Indicative timescales on the Costa del Sol<\/h2>\n<p>As a reference, permit timescales vary a great deal between municipalities: today, as a rough guide, Estepona and Benahav\u00eds tend to resolve faster than M\u00e1laga city or Marbella, with Mijas and Torremolinos somewhere in between. These are orders of magnitude that should be confirmed case by case, because they change with the workload of each technical office.<\/p>\n<h2>How we manage it at Klic Arquitectos<\/h2>\n<p>We process the permit ourselves from start to finish: everything that goes back and forth with the municipal technicians is handled directly by us. We personally know the technical offices of M\u00e1laga, Marbella, Estepona, Benahav\u00eds, Mijas and Torremolinos, which helps to anticipate requests and to resolve queries before they turn into delays.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>How long does a hotel permit take on the Costa del Sol?<\/h3>\n<p>It depends on the municipality and the type of works. Timescales vary considerably between town halls; a complete file that complies with the regulations is what shortens them most. It should be estimated case by case at the start of the project.<\/p>\n<h3>Is hotel use permitted on any plot?<\/h3>\n<p>No. It must be admitted by the planning framework (the PGOU or by-law) for that plot. Checking the compatibility of use is the first step before buying or designing.<\/p>\n<h3>Is the tourism classification separate from the building permit?<\/h3>\n<p>Yes. The tourism classification is processed with the Junta de Andaluc\u00eda and is independent of the municipal building permit and the opening licence. Both must be planned in parallel.<\/p>\n<h2>Planning a hotel project?<\/h2>\n<p>At Klic Arquitectos we design hotels and manage their permits in M\u00e1laga and on the Costa del Sol. <a href=\"https:\/\/www.klicarquitectos.com\/en\/contact\/\">Tell us about it in a first, no-obligation call<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>One of the factors that most shapes the timetable of a hotel project on the Costa del Sol is not the construction but the permit. Securing hotel use and the building permit on time makes the difference between opening in the planned season or missing it. We explain what the timescales depend on and how&#8230;<\/p>\n","protected":false},"author":2,"featured_media":2376,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[44,56],"tags":[],"class_list":["post-20011","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog-en","category-hotel"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hotel use permits on the Costa del Sol: timescales by town hall | Klic Arquitectos<\/title>\n<meta name=\"description\" content=\"Timescales for hotel use permits on the Costa del Sol: which authorisations are involved, what the timing depends on and how to shorten it.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hotel use permits on the Costa del Sol: timescales by town hall | Klic Arquitectos\" \/>\n<meta property=\"og:description\" content=\"Timescales for hotel use permits on the Costa del Sol: which authorisations are involved, what the timing depends on and how to shorten it.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/\" \/>\n<meta property=\"og:site_name\" content=\"Klic Arquitectos\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/klicarquitectos\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-12T10:01:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-05T00:30:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/03-scaled-2-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1001\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin_klicarquitectos\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_klicarquitectos\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/\"},\"author\":{\"name\":\"admin_klicarquitectos\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/person\\\/e294220939ad67cf9ddd01836fd56284\"},\"headline\":\"Hotel use permits on the Costa del Sol: timescales by town hall\",\"datePublished\":\"2026-08-12T10:01:32+00:00\",\"dateModified\":\"2026-09-05T00:30:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/\"},\"wordCount\":493,\"publisher\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/03-scaled-2-scaled.jpg\",\"articleSection\":[\"Blog\",\"Hotel\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/\",\"name\":\"Hotel use permits on the Costa del Sol: timescales by town hall | Klic Arquitectos\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/03-scaled-2-scaled.jpg\",\"datePublished\":\"2026-08-12T10:01:32+00:00\",\"dateModified\":\"2026-09-05T00:30:27+00:00\",\"description\":\"Timescales for hotel use permits on the Costa del Sol: which authorisations are involved, what the timing depends on and how to shorten it.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/03-scaled-2-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/03-scaled-2-scaled.jpg\",\"width\":1920,\"height\":1001,\"caption\":\"Hotel con fachada curva blanca, proyecto hotelero por Klic Arquitectos\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hotel use permits on the Costa del Sol: timescales by town hall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/\",\"name\":\"Klic Arquitectos\",\"description\":\"Estudio de arquitectura en M\u00e1laga. Dise\u00f1o, obra nueva y reformas\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#organization\",\"name\":\"Klic Arquitectos\",\"alternateName\":\"KlicStudio\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/logo.jpg\",\"contentUrl\":\"https:\\\/\\\/www.klicarquitectos.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/logo.jpg\",\"width\":520,\"height\":485,\"caption\":\"Klic Arquitectos\"},\"image\":{\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/klicarquitectos\",\"https:\\\/\\\/www.instagram.com\\\/klicarquitectos\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/klicstudio\\\/\",\"https:\\\/\\\/www.pinterest.es\\\/klicarquitectos\\\/\",\"https:\\\/\\\/www.houzz.es\\\/pro\\\/klicarquitectos\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.klicarquitectos.com\\\/en\\\/#\\\/schema\\\/person\\\/e294220939ad67cf9ddd01836fd56284\",\"name\":\"admin_klicarquitectos\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1ec28fecc68f7981b12861933ae317f224f57df5d121c1e146a9aa5251bbfa82?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1ec28fecc68f7981b12861933ae317f224f57df5d121c1e146a9aa5251bbfa82?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1ec28fecc68f7981b12861933ae317f224f57df5d121c1e146a9aa5251bbfa82?s=96&d=mm&r=g\",\"caption\":\"admin_klicarquitectos\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hotel use permits on the Costa del Sol: timescales by town hall | Klic Arquitectos","description":"Timescales for hotel use permits on the Costa del Sol: which authorisations are involved, what the timing depends on and how to shorten it.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/","og_locale":"en_US","og_type":"article","og_title":"Hotel use permits on the Costa del Sol: timescales by town hall | Klic Arquitectos","og_description":"Timescales for hotel use permits on the Costa del Sol: which authorisations are involved, what the timing depends on and how to shorten it.","og_url":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/","og_site_name":"Klic Arquitectos","article_publisher":"https:\/\/www.facebook.com\/klicarquitectos","article_published_time":"2026-08-12T10:01:32+00:00","article_modified_time":"2026-09-05T00:30:27+00:00","og_image":[{"width":1920,"height":1001,"url":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/03-scaled-2-scaled.jpg","type":"image\/jpeg"}],"author":"admin_klicarquitectos","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_klicarquitectos","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/#article","isPartOf":{"@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/"},"author":{"name":"admin_klicarquitectos","@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/person\/e294220939ad67cf9ddd01836fd56284"},"headline":"Hotel use permits on the Costa del Sol: timescales by town hall","datePublished":"2026-08-12T10:01:32+00:00","dateModified":"2026-09-05T00:30:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/"},"wordCount":493,"publisher":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#organization"},"image":{"@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/#primaryimage"},"thumbnailUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/03-scaled-2-scaled.jpg","articleSection":["Blog","Hotel"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/","url":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/","name":"Hotel use permits on the Costa del Sol: timescales by town hall | Klic Arquitectos","isPartOf":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/#primaryimage"},"image":{"@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/#primaryimage"},"thumbnailUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/03-scaled-2-scaled.jpg","datePublished":"2026-08-12T10:01:32+00:00","dateModified":"2026-09-05T00:30:27+00:00","description":"Timescales for hotel use permits on the Costa del Sol: which authorisations are involved, what the timing depends on and how to shorten it.","breadcrumb":{"@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/#primaryimage","url":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/03-scaled-2-scaled.jpg","contentUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/03-scaled-2-scaled.jpg","width":1920,"height":1001,"caption":"Hotel con fachada curva blanca, proyecto hotelero por Klic Arquitectos"},{"@type":"BreadcrumbList","@id":"https:\/\/www.klicarquitectos.com\/en\/hotel-use-permits-costa-del-sol-timescales-by-town-hall\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.klicarquitectos.com\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Hotel use permits on the Costa del Sol: timescales by town hall"}]},{"@type":"WebSite","@id":"https:\/\/www.klicarquitectos.com\/en\/#website","url":"https:\/\/www.klicarquitectos.com\/en\/","name":"Klic Arquitectos","description":"Estudio de arquitectura en M\u00e1laga. Dise\u00f1o, obra nueva y reformas","publisher":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.klicarquitectos.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.klicarquitectos.com\/en\/#organization","name":"Klic Arquitectos","alternateName":"KlicStudio","url":"https:\/\/www.klicarquitectos.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/logo.jpg","contentUrl":"https:\/\/www.klicarquitectos.com\/wp-content\/uploads\/2025\/10\/logo.jpg","width":520,"height":485,"caption":"Klic Arquitectos"},"image":{"@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/klicarquitectos","https:\/\/www.instagram.com\/klicarquitectos\/","https:\/\/www.linkedin.com\/company\/klicstudio\/","https:\/\/www.pinterest.es\/klicarquitectos\/","https:\/\/www.houzz.es\/pro\/klicarquitectos"]},{"@type":"Person","@id":"https:\/\/www.klicarquitectos.com\/en\/#\/schema\/person\/e294220939ad67cf9ddd01836fd56284","name":"admin_klicarquitectos","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1ec28fecc68f7981b12861933ae317f224f57df5d121c1e146a9aa5251bbfa82?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1ec28fecc68f7981b12861933ae317f224f57df5d121c1e146a9aa5251bbfa82?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1ec28fecc68f7981b12861933ae317f224f57df5d121c1e146a9aa5251bbfa82?s=96&d=mm&r=g","caption":"admin_klicarquitectos"}}]}},"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/20011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/comments?post=20011"}],"version-history":[{"count":1,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/20011\/revisions"}],"predecessor-version":[{"id":20100,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/posts\/20011\/revisions\/20100"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/media\/2376"}],"wp:attachment":[{"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=20011"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/categories?post=20011"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.klicarquitectos.com\/en\/wp-json\/wp\/v2\/tags?post=20011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}